01. Wrapping it all up
Wrapping it all up Heading
Wrapping It All Up
L8 01 Welcome
Intro Text
At the end of a Design Sprint, there are a couple different possible outcomes:
- Move to implementation
- Iterate on the specifics of the prototype
- Run another Design Sprint
- Abandon the idea
Glossary
Here are some of the terms we will be covering in this lesson:
| Term | Definition |
|---|---|
| Iterate | going through the process again in order to make improvements |
| Evangelize | to get people excited and bought into the project |
| PRD | Product Requirements Doc that specifies why we’re building a product, how the product will work, and how the product’s success will be measured. |
| P0 | a launch blocking feature. The product will not launch without it |
| P1 | a nice to have feature at launch, but not required. If not present at launch it should be a fast follow |
| P2 | a desirable feature |